Install Checklist
An install checklist built for South African sites, covering access, power, extraction, floor space and handover points before delivery.
When Install Checklist matters on a working week
The Install Checklist page covers the site points to confirm before delivery, including access, power, extraction, floor space and handover items. It gives South African workshops a simple way to check whether the room is actually ready for the machine.
List the exact machine model, where it will stand, the delivery window, and any site restriction before the truck arrives. Access width, three-phase supply, extraction ducting, and forklift reach often decide whether an install can start on time. Across Gauteng, Durban, Cape Town, and smaller inland towns, dust levels, humidity, and load-shedding planning all affect what must be checked first.
Take site photos before pallets, crates, or wrapping are moved into position. Include the doorway, passage width, DB board, plug points, extraction point, and the machine area from more than one angle. Those images help when a crate will not pass a corner, a breaker is undersized, or a missing hose only shows up on delivery day.
Access, power, extraction, handover
Use the checklist to confirm the room is genuinely ready for delivery and setup. It covers entry dimensions, power supply, compressed air where needed, extraction, network access, and who is present for sign-off. That leaves fewer surprises when the machine is unloaded and connected.
Attach the completed checklist to the matching job file before transport is booked. Note any missing sockets, blocked access, low door height, uneven concrete, or pending electrical work, then send it through the contact form. Include the actual machine name and the site location so the install team can read the page against the right workshop.
- Door widths and pallet access checked
- Supply, breakers, and plugs confirmed
- Photos attached for handover reference
Site conditions across South Africa
Johannesburg and Pretoria sites often need extra attention on dust, forklift access, and power stability in older industrial units. Durban and Cape Town workshops may need moisture control, rust checks on stored accessories, and better planning around sea air near open roller doors. Smaller regional shops also benefit from checking turning space for delivery vehicles before the truck leaves the depot.
Three-phase supply must match the machine requirement, and the earthing should be verified before connection. Extraction runs need to be measured, not guessed, especially on routers where hose length and bends affect chip removal. If the unit uses chilled water, compressed air, or RIP networking, mark those services on the checklist before handover starts.
Operated by Astros Marketing (Pty) Ltd from 2 Makro Place, Sunnyrock 1401.
What to record before delivery
Fill in the install checklist with floor photos, delivery or fitment timing, and anything missing, damaged, or not powering up. Write the subject line around the actual machine and site.
Write down what is ready, what is still outstanding, and who is handling each open item. Useful notes include door height, stair count, lifting equipment on site, socket type, extraction diameter, and the exact install window. Keep that record with the machine file so the delivery crew, electrician, and operator are working from the same information.