Project
Centurion Lab
A Centurion lab floor configured for testing, calibration, and service checks before the machine hits production.

How Centurion Lab fits into weekly machine checks
Centurion Lab is configured for testing, calibration and service checks before a machine moves into production. It works for a Centurion setup where controlled prep matters as much as the final print run.
For Centurion Lab, start with the machine model, print method or spindle setup, and the test purpose before any service work begins. Inland dust around Centurion affects rails, encoder strips, fans and vacuum zones, so the bench setup and cleaning sequence must match the actual condition. Include the planned test window, power status, and any transport damage seen when the unit arrived.
Take clear photos of the machine in received condition before covers come off or consumables are changed. In this lab setup, those images help compare alignment, ink delivery, vacuum hold, gantry travel, or spindle behaviour after calibration. A short record beside the machine keeps the handover tied to what was physically checked, not memory from the workshop.
Centurion Lab handover record
The record should read like a bench-tested machine file, not a vague service summary. That means a clear fault description, the checks performed, the settings used for testing, and the next action before production use. On a printer, that may be nozzle condition and media tracking. On a CNC unit, it may be homing accuracy, spoilboard hold-down, and toolpath behaviour.
Use Centurion Lab as the reference point when a machine is being prepared for testing, calibration, or fault tracing before it returns to work. Check serial details, heads, pumps, routers, tools, cables, and any extras against what is physically in the lab area before collection or dispatch.
- Bench checks before production release
- Received-condition photos kept with test notes
- Model and fault details captured clearly
Centurion testing conditions that matter
A Centurion lab setup needs stable power, enough room for media handling, and access to the machine from service panels to cable routes. Transported units often arrive with loose fittings, shifted gantries, dirty rails, or missing accessories, so the first inspection must separate transit issues from workshop faults. Where a printer is being recommissioned, note ink type, stored age of consumables, and whether dampers, caps, or lines were left standing.
Highveld dust changes the way fans, sensors, bearings, and linear guides are checked during service work. Dry inland air can also show up in static on rigid media and vinyl during print tests, while unstable power affects heater cycles, vacuum performance, and controller restarts. In a lab environment, test prints and motion checks should prove repeatability under controlled settings before the machine goes near a production queue.
Operated by Astros Marketing (Pty) Ltd from 2 Makro Place, Sunnyrock 1401.
Machine notes tied to this lab
Send lab photos, model information, test results, and the faults already logged so the service work starts from the real machine condition.
Log the Centurion Lab note on the same day the inspection, calibration, or repair test was completed. When the buyer, operator, or workshop manager asks what was done, that record should tie the machine condition, test method, and findings to one traceable page. Attach it to the machine sheet and any project note so the handover stays linked to the exact unit checked.
What our Large-Format Print customers say
Verified Google reviews

