Export Week deals with crating pressure, dispatch deadlines and pre-shipment checks that only become obvious when the load-out gets close.

How Export Week works in a production week
Export Week is built around the pressure that arrives when machines or jobs must leave the floor on schedule. It deals with crating, dispatch preparation and pre-shipment checks before a load goes out.
For Export Week, log the machine model, destination country, crate size, and booked collection slot first. Border paperwork, humidity on the coast, and power interruptions before dispatch can affect what must be removed, wrapped, or tested again. BrightFrame writes for large-format print rooms and CNC workshops sending equipment out through Johannesburg, Durban, Cape Town, and inland depots across Southern Africa.
Photograph the machine before panels come off, cables are tied back, or vacuum lines are stripped for packing. Include close shots of the carriage, bed, spindle area, and any existing marks that matter at unpacking. That record helps when the crate is opened days later and someone needs to match condition, accessories, and mounting points to the pre-shipment state.
Crate-ready machine handover
Export Week leaves you with a sign-off trail that names what was tested, what was removed, and what must travel in a separate box. The paperwork can cover printheads parked for transport, vacuum pumps isolated, spindle tooling packed, and loose guards labelled. One clear dispatch record is more useful than scattered messages when the shipment reaches the next workshop.
Use Export Week alongside crate markings and a final accessory count before the truck is loaded. If the shipment crosses a border, check serial numbers, power requirements, and consumables that should not travel inside the machine. The contact form can be used to send the destination and collection date.
- Crating checks for printers and routers
- Pre-shipment photos before wrapping starts
- Documents matched to the outgoing machine
Border dispatch conditions to note
Export Week often lands against freight cut-offs at OR Tambo, container bookings in Durban, or line-haul schedules moving north from Gauteng. A machine leaving for Botswana, Namibia, Zambia, or Mozambique may need different plug details, spare part lists, and crate labels than a local transfer. Record who is handling collection, where lifting gear is available, and whether the site has dock access or only kerbside loading.
Sea air near the coast affects exposed metal if wrapped too early and left standing before collection. Inland dust makes it worth cleaning rails, beds, and fans before the final condition photos are taken. When load-shedding changes the test window, run the last print or motion check while stable power is available and attach the result to the dispatch file.
Operated by Astros Marketing (Pty) Ltd from 2 Makro Place, Sunnyrock 1401.
Load-out notes that matter
Use Export Week for crating prep, machine sign-off, and documentation support when print or CNC equipment is moving across borders in Southern Africa.
Write the Export Week note on the day the machine is checked and packed, not after the truck has gone. Include the accessory list, transport locks fitted, software dongles removed, and any fault still present at dispatch. When the buyer or receiving technician asks what left the workshop, the record should show the exact shipping condition.